VAI Developments attribute the implementation of the central air conditioning system for 4T4 project to Gascool Company
VAI Developments announced contracting with Gascool, a leading company in the field of energy and cooling, to implement the central air conditioning system for 4T4 project in the New Administrative Capital, as part of the company’s plan to cooperate with strong entities to implement a project with the highest quality standards.
Mahmoud Abdeen VAI Developments managing director, assured the company’s keenness to implement the project within high quality specifications, as well as to adhere to all the details and conditions that were presented to the project’s clients, in accordance with the building requirements of the Administrative Capital for Urban Development Company.
He added that Gascool is one of the leading companies in the petroleum sector that owes a strong reputation in the field of central cooling systems according to the best global recognized technology in this field, besides its recorded experience in implementing and establishing such projects in all their various contractual forms.
He pointed that the project capacity was determined to be a total cooling capacity of approximately 430 tons for the building in the New Administrative Capital, including the basic designs for establishing, erecting, and operating the central air conditioning system within “VRF” system, noting that the consulting studies implemented by VAI Commercial Real Estate Development Company, aligns with the space allocated for creating the central air conditioning system.